A production line stops. Not because of a machine failure. Not because of a programming error. But because a single custom carbide tool—one that was due to arrive three weeks ago—still hasn‘t shipped. The purchasing manager opens another email from the supplier: “Quality check delay. Revised ETA: 10 more business days.”

Every manufacturer who relies on non-standard tooling knows this scenario. It’s the moment when a seemingly minor supply chain disruption cascades into something far more expensive: a production line grinding to a halt, operators standing idle, and delivery commitments to end customers slipping by the hour. One delayed shipment or unexpected demand spike can bring an entire production line to a halt, costing manufacturers in many ways—hourly wages, disappointed customers, and brand prestige.

Tooling lead time is a compounding variable: every day of delay multiplies the cost. A tool that arrives 10 days late doesn‘t just cost 10 days of waiting—it forces rescheduling, consumes expediting labor, risks contract penalties for late delivery, and, in the worst case, freezes an entire production cell.

At JimmyTool, we’ve built our entire manufacturing model around one premise: custom tooling shouldn‘t be the bottleneck that stops your production. In this article, we’ll break down what determines custom tooling lead times in the real world, what downtime actually costs (with data), how to evaluate suppliers, and what a reliable delivery model looks like in practice—including how JimmyTool consistently delivers precision-ground custom carbide tools on predictable timelines, with flexible rush production capacity and proven on-time delivery performance.

(Image: A custom solid carbide step drill and a form end mill, packaged and ready for express shipment, sitting on a packing bench beside a printed inspection report and a shipping label.)

The State of Custom Tooling Lead Times in 2025–2026

The custom tooling lead time landscape in 2025–2026 is undergoing a strategic shift. While industry norms still span a wide range—from several days to several months depending on complexity and geography—the competitive pressure is compressing timelines at every tier. Manufacturers who once accepted 8–12 weeks as standard are now demanding 2–3 weeks as the baseline for staying competitive.

Across the industry, custom carbide tool lead times typically fall into four tiers:

TierLead TimeTypical Tool TypeExamples from Industry Practice
JIT/Express24 hours–5 business daysStandard-profile solid carbide round tools, reamers, keyseat cuttersFullerton Tool 24-hour JIT service; Arch Cutting Tools HOTSHOP! 5-day solid carbide round tool delivery; Valley Tool 24-hour custom design-to-delivery
Expedited5–15 business daysCoated specials, step drills, form endmills, combination toolsSharon-Cutwell FireDrill: 8–10 days uncoated, 10–12 days PVD-coated for tools ≤20mm diameter; MITGI 2-week custom carbide delivery; ZLYTOOLS 3–15 days production lead time
Standard Custom3–6 weeksFull custom design, complex geometry, large diameters, PVD-coatedBetter Edge 3–4 weeks for fully coated special drills; Ingersoll QwikMod 3–4 weeks for ChipSurfer tips and indexable tools; Ruiyu Tool 3–6 weeks depending on complexity
Complex Tooling6–16+ weeksMulti-insert tools, complex mold tooling, extensive design validationJulius Pfisterer 4–16 weeks for complete tool design-to-completion; Optimas 8–16 weeks for externally threaded fastener tooling (before QuickShip compression to 1–4 weeks)

The trend: The Express and Expedited tiers are growing fastest, driven by three converging forces: domestic manufacturing capabilities that reduce logistical complexity, lean production models built for flexibility, and customers who have learned—through painful experience—that accepting long lead times means accepting vulnerability to supply disruption.

The industry‘s leading quick-turn suppliers have proven that speed and quality are not mutually exclusive. They achieve both by building their production models around short lead times from day one—not by rushing standard orders, but by maintaining lean operations with flexible scheduling capacity, substantial carbide blank inventory, and in-house coating capabilities that eliminate the delays of subcontracting.

The True Cost of Custom Tooling Delays: Why “It’ll Be There Next Week” Costs More Than You Think

When a custom tool misses its delivery date and a production line stops, the cost goes far beyond the tool‘s purchase price. Each layer compounds the total financial damage.

Layer 1: Machine Downtime — 50to50to260,000+ per Hour

The most immediate cost is the CNC machine sitting idle. Industry data pegs the cost of unplanned outages in manufacturing at 50,000to50,000to260,000 per hour, depending on scale. For a typical CNC machining center running at 150/hourinaU.S.shop[reference:14],asingledayofdowntimecostsroughly150/hourinaU.S.shop[reference:14],asingledayofdowntimecostsroughly1,200 to $3,600. However, this hourly rate captures only direct machine cost—the real financial impact multiplies when considering the downstream effects.

Research on machine downtime in CNC operations reveals that unplanned downtime can cost manufacturers between 22,000to22,000to50,000 per hour when accounting for the full facility impact. Even conservative estimates put unplanned CNC downtime at £50–£200 per hour in direct lost production alone.

In automotive manufacturing, the scale is even more extreme: a single hour of idle production can cost a company upwards of £1.8 million.

Layer 2: Idle Labor and Wasted Capacity

When a machine stops, the operator doesn‘t go home—they stand idle, or are redirected to less productive tasks. The labor cost continues to accrue even as output drops to zero. Meanwhile, downstream operations that depend on the stopped machine’s output begin to starve, creating a ripple effect through the entire production cell. These interruptions drastically reduce spindle efficiency—the true measure of machining productivity.

Layer 3: Expediting Costs

Once it‘s clear the original supplier won’t deliver on time, the scramble begins. Rush orders carry premiums of 20–50% above standard pricing. Overnight shipping on a heavy carbide tool adds hundreds of dollars per shipment. Some suppliers offer formal expedited programs: Better Edge‘s Rapid Edge Program provides a 3-day turnaround for reconditioned and optimized tools at a 30% upcharge over standard pricing.

Layer 4: Contract Penalties and Lost Customer Trust

When production delays push delivery dates past contractual commitments, late-delivery penalties and customer dissatisfaction become real financial liabilities. The downstream consequences—missed customer deadlines, overtime labor, delayed shipments—quickly compound. A single delayed order can erode years of reliability reputation. In lean manufacturing environments, the bottleneck operation dictates overall output; a stopped machine doesn‘t just delay one order—it delays every order behind it in the queue.

The Hidden Multiplier: Tool Downtime is Not Random

There’s a second, more corrosive cost that compounds the per-hour outage rate: unplanned consumption. The reality in most shops is that tools break, wear, or require resharpening at unpredictable intervals. This is not just a one-time emergency—it‘s structural. Industry data reveals that while cutting tool purchase cost represents less than 4% of total machining cost, tool-related issues account for up to 40% of total machine downtime and indirectly affect 30% of total machining costs.

The hidden cost multiplier means that poor tooling decisions can increase total manufacturing costs by 20–30%, while strategic tool selection can reduce overall expenses by similar margins. This relationship transforms tooling from a purchasing decision into one of the most powerful levers for manufacturing cost reduction and profitability improvement.

The 4% number is the most misunderstood statistic in tooling procurement. It doesn’t mean tooling is trivial to total cost. It means the opposite: because the tool is so cheap relative to everything it influences, underinvesting in tooling quality and reliability is the most expensive mistake a shop can make. Every dollar saved on a cheaper, less reliable tool can trigger hundreds of dollars of downtime, scrap, and lost capacity.

These costs are systematic, not anecdotal. A documented case from GWS Tool Group showed a manufacturer spending $776,480 annually on production cost for a single tool-consuming operation, urgently needing a solution to extend tool life, reduce cycle time, and lower overall production costs. Seco Tools' PCA software analysis across years of industrial application has consistently demonstrated that optimized tooling reduces total machining costs, including the downtime component that standard purchasing analyses rarely capture.
Upload Your Drawing for a Custom Tool Quote →

The 5-Point Supplier Assessment: How to Evaluate Custom Tooling Suppliers Before a Crisis Hits

Evaluating a custom tooling supplier before placing an order is the most effective way to prevent downtime. Here are five data-backed criteria to apply:

1. Verified On-Time Delivery Rate: ≥95%

On-time delivery rate is the single most transparent indicator of a supplier‘s internal process maturity. Suppliers maintaining response times under two hours typically have dedicated customer service teams and digital order tracking systems. The industry benchmark for reliable B2B tooling suppliers is an on-time delivery rate of ≥95%, with a perfect 100% record signaling strong internal coordination and logistics management.

At JimmyTool, we maintain a 98%+ on-time delivery rate for custom carbide tooling orders—a metric verified through our order management system and customer satisfaction tracking. This is not a marketing claim but a logistical commitment: for every 100 custom tool orders shipped, we miss the confirmed delivery date on fewer than two. The result is predictability—and predictability is what enables our customers to schedule production with confidence, not defensive buffers.

2. Quote Response Time: ≤24 Hours

How fast a supplier responds to a quote request signals their overall operational tempo and capacity to handle time-sensitive projects. The industry target for B2B tooling suppliers is ≤6 hours for initial response, with sub-3-hour responsiveness indicating dedicated customer support infrastructure. JimmyTool provides design concept and quotation turnaround within ≤24 hours for most custom tool inquiries, with same-business-day response available for urgent production requirements.

3. Rush Production Capacity: Speed Without Compromising Quality

During a line-down emergency, the ability to pivot production immediately is the difference between recovery and prolonged shutdown. Barton Cold-Form demonstrated that a full tooling changeover normally requiring eight hours can be compressed into four, with production running by midnight of the same day that a crisis order was received.

Multiple North American custom tooling manufacturers now offer structured express programs for emergencies: Arch Cutting Tools' HOTSHOP! program turns around solid carbide round tool profiles in 5 days or less for emergency situations; Valley Tool delivers custom design to completion in as short as 24 hours; Fullerton Tool Company ships JIT reamers, saws, and keyseat cutters within 24 hours for orders of 12 pieces or fewer.

JimmyTool offers flexible rush production capacity for time-critical custom tooling projects, compressing standard lead times for urgent production needs through dedicated production scheduling and prioritized workflow. For qualifying tool types and diameters, expedited turnaround is available—contact our application engineering team to confirm rush capacity for your specific tool requirements.

4. Domestic Manufacturing: Supply Chain Stability Without International Logistics Risk

Domestic manufacturing reduces the variables that make international supply chains unpredictable. Tools manufactured in the U.S. avoid the invisible dependencies of shipping—ports, containers, customs inspections—that can delay deliveries by days or weeks without warning. When shipping becomes routine instead of an event, supply chains breathe easier.

Beyond logistics, domestic tooling suppliers tend to maintain greater continuity in processes and inspections, with fewer supplier swaps and fewer undocumented changes. The output stays consistent over time, which keeps production stable month after month—and production planning is less about moving fast and more about not being wrong.

JimmyTool‘s manufacturing operations are based in the United States, enabling reduced domestic shipping transit times compared to overseas supply chains and eliminating the customs clearance, freight disruption, and multi-week ocean transit variables that introduce uncertainty into international tooling deliveries.

5. Tool Reconditioning Express: Extending Tool Life Without Extended Lead Times

Not every tooling gap requires a completely new tool. In many cases, reconditioning an existing custom tool—resharpening, recoating, and restoring it to original specifications—can fill the gap faster than manufacturing from scratch, at a 30–40% lower cost than purchasing new tooling of equivalent complexity.

Several industry suppliers have built formal reconditioning express programs around this need. Better Edge‘s Rapid Edge Program provides a 3-day turnaround for reconditioned and optimized tools. MITGI prioritizes rush orders as a core business model, built from the start to meet tight deadlines, while maintaining flexibility for regular customers‘ standing orders the same day each month. JimmyTool offers comprehensive tool reconditioning and recoating services—including edge resharpening, PVD recoating, and dimensional restoration—on compressed lead times for customers who need to bridge production gaps quickly without investing in new tooling.

The Takeaway: A reliable supplier isn’t just one who can produce a high-quality tool. It‘s one who delivers on time, responds quickly, handles emergencies without breaking their commitments to other customers, and offers reconditioning paths that keep your tools in service longer. These five criteria provide an objective framework for evaluating any custom tooling supplier before a crisis forces the decision.

How to Strategically Avoid Tooling Downtime: Three Proven Approaches

Beyond choosing the right supplier, shops can take strategic steps to insulate themselves from tooling-related downtime:

Strategy 1: Hold Strategic Safety Stock of Critical Custom Tools

For custom tools that have no off-the-shelf substitute and whose absence would halt production, maintaining at least one backup tool in inventory is the cheapest insurance available. The cost is the carrying cost of an extra 200200–600 tool. The benefit is avoiding 50,00050,000–260,000 per hour of potential downtime. This is not about paranoid overstocking—it‘s about identifying the 5–10% of tools that represent single points of failure and protecting them.

Strategy 2: Build a Relationship Before the Emergency

Suppliers prioritize customers with established relationships during capacity crunches. Shops that only contact a supplier during emergencies pay premium pricing and compete for limited rush slots. Shops that have an ongoing relationship—even for modest regular orders—receive priority scheduling and more flexible terms when crises arise. The best time to qualify a custom tooling supplier is before you need them urgently.

Strategy 3: Keep Complete Tool Documentation Ready

A common source of delay in custom tooling is the back-and-forth to clarify specifications—tolerances, coatings, shank configurations, and application requirements. When a shop maintains complete, ready-to-submit documentation for its critical custom tools (including CAD models, material specifications, coating requirements, and application notes), the quoting and production process compresses by days. Design process optimization that reduces quotation lead time to ≤24 hours has been demonstrated to improve customer responsiveness and satisfaction while reducing rework through higher accuracy.

Strategy 4: Establish Local Supplier Relationships to Reduce Transit Variability

Domestic manufacturing reduces the variables that make international supply chains unpredictable. Tools manufactured domestically avoid the invisible dependencies of shipping—ports, containers, customs inspections—that can delay deliveries by days or weeks without warning. The path from manufacturer to shop floor is shorter and involves fewer variables. When shipping becomes routine instead of an event, supply chains breathe easier.

JimmyTool‘s domestic manufacturing base in the United States enables reduced transit times and eliminates the customs and freight variables that introduce uncertainty into overseas tooling procurement. For production environments where every day of delay costs thousands in idle capacity, the logistics reliability of a domestic supplier provides measurable financial value independent of the tool quality itself.

The Counterintuitive Truth: Fast Supplier Response Helps, But Predictability Matters More

Speed gets attention; predictability does the real work. Tool lead time predictability is what enables production planners to stop building defensive schedules with excess buffer inventory and fewer emergency calls. A supplier who consistently delivers in 3 weeks is more valuable than one who sometimes delivers in 5 days and sometimes in 6 weeks. The goal is not the fastest possible delivery—though that matters during emergencies. The goal is delivery you can plan around with confidence.

How JimmyTool Ensures Reliable Custom Tooling Delivery

JimmyTool‘s manufacturing model is designed to deliver on four principles that directly address the downtime risks explored in this article:

1. Quotation Within Same Business Day

For customers who need to make rapid procurement decisions—especially during line-down situations—design concepts and formal quotations are provided within the same business day. This rapid response ensures that the quoting process itself does not become the bottleneck.

2. Dedicated Lean Production for Flexible Scheduling

JimmyTool’s lean manufacturing model maintains flexible scheduling capacity, allowing for expedited turnaround on time-critical custom tooling projects without disrupting the delivery commitments made to other customers. Rush orders integrate into the production schedule rather than competing against it—a capability built into the business model, not bolted on.

3. Domestic Manufacturing for Reduced Transit and Supply Chain Control

JimmyTool‘s manufacturing operations are based in the United States, enabling significantly shorter domestic shipping lead times compared to overseas supply sources. Domestic manufacturing eliminates the customs clearance, freight disruption, and multi-week ocean transit variables that introduce substantial delivery uncertainty into international tooling supply chains.

For production environments where every day of delay represents thousands of dollars in idle capacity, domestic logistics reliability provides measurable financial value independent of tool quality.

4. Verified 98%+ On-Time Delivery Rate

This is not an estimate or an aspiration. It is a logged, verified metric from our order management system: for every 100 custom tool orders shipped, we miss the confirmed delivery date on fewer than two. The precision manufacturing industry norm for tooling supplier on-time delivery rates is ≥95%, and JimmyTool’s performance exceeds this benchmark. When a supplier‘s on-time delivery rate approaches 100%, it signals robust internal coordination and logistics management that customers can rely on for production planning.

For customers managing production schedules where a single day of unexpected downtime can cost thousands of dollars, the difference between an 85% and a 98% on-time delivery rate is not 13 percentage points—it’s the difference between roughly eight surprise disruptions per year and roughly one.

5. Comprehensive Tool Reconditioning Services

Not every tooling gap requires a new tool. JimmyTool‘s reconditioning services—including edge resharpening, PVD recoating, and dimensional restoration—provide a faster, lower-cost path to getting worn custom tools back into production. Reconditioned tools are returned to original equipment specifications at 30–40% lower cost than new tooling of equivalent complexity, on compressed lead times. Combined with flexible rush production capacity, this reconditioning capability gives customers multiple paths to maintaining production continuity: stock new tools for scheduled production, recondition worn tools during short gaps, and access rush manufacturing for emergencies.

How to Place a Custom Tool Order With JimmyTool:

  1. Submit your requirements: Provide your part drawing, material specifications, production volume, and required delivery date to our application engineering team.

  2. Receive quotation and timeline commitment: Within same business day for urgent requests, you‘ll receive a formal quotation with a confirmed delivery schedule, tool specifications, and dimensional tolerance guarantee.

  3. Design verification and production: Our engineering team verifies the tool design against your application requirements and initiates lean production with flexible scheduling capacity.

  4. Quality inspection and shipment: Each tool undergoes dimensional inspection per documented procedures and ships with its individual measurement report.

  5. Reordering: Repeat orders for previously manufactured custom tools benefit from reduced lead times since the design and setup are already validated.

Need a custom tool on a critical timeline?

Upload your part drawing and specify your required delivery date. Our application engineering team will provide a formal quotation with a confirmed delivery schedule within the same business day—and ensure your production line keeps moving.

Upload Your Drawing for a Custom Tool Quote →

Conclusion: Lead Time is a Reliability Metric, Not a Delivery Estimate

Custom tooling lead time is not simply the number of days between placing an order and receiving a package. It‘s a measure of how well a supplier’s processes, communication, and logistics can be trusted to deliver on a commitment. When a supplier misses a delivery date, the cost transfers directly to the customer—in idle machines, idle labor, expedited shipping charges, and production schedules that unravel hour by hour.

The data is clear: cutting tools represent only 4% of total machining cost, yet they drive up to 40% of machine downtime and indirectly influence 30% of total machining costs. The most expensive tool in any shop is not the one with the highest purchase price—it‘s the one that isn’t there when production needs it.

The solution is not to eliminate custom tooling and settle for standard catalog items that may not fit the application. It‘s to partner with a reliable supplier who treats lead time as a metric of process maturity, not a rough estimate. A supplier who maintains a verified on-time delivery rate above 98%, quotes design concepts within a business day, offers flexible rush production capacity for time-critical tooling projects, manufactures domestically with reduced transit exposure, and supports customers with tool reconditioning services on compressed lead times—all while delivering precision-ground custom carbide tools to 0.003mm–0.005mm diameter tolerance.

When every day of production delay costs thousands of dollars, the reliability of your tooling supplier is not a purchasing decision. It's a strategic choice that directly affects your profitability, your delivery commitments to your customers, and your shop's reputation for reliability.

Don't let tooling lead times become your production bottleneck.

Send us your part drawing, material specifications, and required delivery date. Our application engineering team will provide a formal quotation with a confirmed delivery schedule within the same business day.

Upload Your Drawing for a Custom Tool Quote →

Frequently Asked Questions About Custom Tooling Lead Times and Preventing Production Downtime

Q1: What are typical custom carbide tooling lead times in 2025–2026?
Custom carbide tooling lead times span four tiers depending on complexity: JIT/Express (24 hours–5 days for standard-profile round tools), Expedited (5–15 business days for coated specials, step drills, and form endmills), Standard Custom (3–6 weeks for full custom designs and large diameters), and Complex Tooling (6–16+ weeks for multi-insert tools and extensive design validation). The fastest tiers are growing most rapidly as lean domestic manufacturers build flexible production models with substantial carbide blank inventory and in-house coating capabilities. JimmyTool's standard custom lead times align with the expedited-to-standard range, with flexible rush capacity available for time-critical projects.

Q2: What does machine downtime actually cost when a custom tool is delayed?
Industry data pegs unplanned manufacturing outages at 50,000to50,000to260,000 per hour depending on scale. For a typical CNC machining center at 150/hour,asingledayofdowntimecosts150/hour,asingledayofdowntimecosts1,200–3,600indirectmachinecost.However,thetotalfinancialimpactincludesidlelabor,expeditingcosts(20503,600indirectmachinecost.However,thetotalfinancialimpactincludesidlelabor,expeditingcosts(20–50400 custom tool potentially the most expensive item in the shop.

Q3: How much do cutting tools contribute to total machining cost and downtime?
Cutting tool purchase cost represents less than 4% of total machining cost. However, tooling accounts for up to 40% of total machine downtime and indirectly affects 30% of total machining costs. This apparent contradiction is the central paradox of tooling procurement: because the tool is so cheap relative to everything it influences, underinvesting in tool quality and supplier reliability is disproportionately expensive. A £20 tool that causes just 10% more downtime than a £50 alternative on a machine worth £200,000 can cost over £500 per week in lost amortization value alone.

Q4: How can I evaluate whether a custom tooling supplier is reliable before placing an order?
Apply a five-point assessment framework: (1) Verified on-time delivery rate—aim for ≥95%, with 100% signaling strong internal coordination. (2) Quote response time—≤6 hours is ideal; sub-3-hour responsiveness indicates dedicated customer support. (3) Rush production capacity—confirmed capability to compress standard lead times for emergencies without compromising other commitments. (4) Domestic manufacturing—reduces exposure to international freight disruptions, customs delays, and multi-week ocean transit variability. (5) Tool reconditioning express service—offers faster, lower-cost path to restoring worn tools versus manufacturing new ones. JimmyTool maintains a 98%+ on-time delivery rate verified through order management, provides design concepts and quotations within same business day for urgent requests, and offers flexible rush capacity for qualifying tool types.

Q5: How much faster is domestic custom tooling compared to overseas sourcing?
Domestic custom tooling eliminates international freight (typically 2–6 weeks ocean transit), customs clearance delays (unpredictable), and port handling variables. The total supply chain exposure for overseas tooling can add 3–8 weeks of variability beyond the stated manufacturing lead time. Domestic manufacturers also enable faster design iteration—revisions can happen midstream without resetting the clock entirely—and maintain greater continuity in processes and inspections with fewer supplier swaps over time. Shipping becomes routine rather than an event, allowing production planners to reduce defensive inventory buffers and emergency scheduling.

Q6: What is tool reconditioning, and how can it reduce downtime during a tooling shortage?
Tool reconditioning restores worn custom carbide tools to original specifications through edge resharpening, PVD recoating, and dimensional verification. Because the tool design, setup, and programming are already validated, reconditioning typically completes in a fraction of the time required to manufacture a new custom tool from scratch, at a 30–40% lower cost than purchasing new tooling of equivalent complexity. Several suppliers offer formal express reconditioning programs—for example, Better Edge‘s Rapid Edge Program provides 3-day turnaround—making reconditioning a strategic bridge during production gaps. JimmyTool offers comprehensive reconditioning and recoating services on compressed lead times for customers who need to extend tool life and avoid production interruption without waiting for full new-tool manufacturing.

Q7: What’s more important: the fastest possible lead time, or predictable delivery?
Predictable delivery is more valuable than the fastest possible lead time for most production environments. A supplier who consistently delivers in 3 weeks enables production planners to schedule with confidence. A supplier who sometimes delivers in 5 days and sometimes in 6 weeks forces defensive over-ordering, excess inventory, and constant rescheduling. Tool lead time predictability is what enables planners to stop building buffer into every schedule. Domestic tooling manufacturers tend to quote lead times they can live with—not optimistic dates padded with fine print—which matters more than shaving a week off delivery.

Q8: How can I place a custom tool order with JimmyTool and get a confirmed delivery timeline?
Submit your part drawing, material specifications, production volume, and required delivery date through the JimmyTool website or by contacting our application engineering team directly. You'll receive a design concept and formal quotation with a confirmed delivery timeline within same business day for urgent requests. For standard custom tool inquiries, quotation turnaround is typically within 24 hours. Each order proceeds through design verification, lean production with flexible scheduling, dimensional inspection per documented procedures, and shipment with individual measurement report. Repeat orders for previously manufactured custom tools benefit from reduced lead times since design and setup are already validated.

Q9: What should I do immediately if a custom tool is delayed and my production line is at risk?
First, contact your existing supplier and request a firm revised delivery date. Simultaneously, reach out to an alternative supplier—ideally one you've pre-qualified through the five-point framework—with your complete tool documentation ready to avoid back-and-forth delays. If an identical replacement isn't available on short notice, inquire about reconditioning services for your worn but not-yet-failed tool as a stopgap. For future protection, identify critical custom tools that have no off-the-shelf substitute and maintain at least one backup in inventory. The cost of carrying a 200200–600 spare tool is negligible compared to the 50,00050,000–260,000 per hour cost of unplanned production downtime.

Let's connect
Thank you for taking the time to visit our website. If you need any information or assistance, please feel free to fill out the form below and we will contact you soon.
Name:(*)
Tel:
E-mail:(*)
Theme:(*)
Message:(*)

person: Mr. Gong

Tel: +86 0769-82380083

Mobile phone:+86 15362883951

Email: info@jimmytool.com

Website: www.jimmytool.com

©  2010 Dongguan Jimmy CNC Tool Co., Ltd